Founding Site Programme
Places remaining8of 10 · two already live

Ten UK sites. £4,035 of value. No cost.

Why it's free. We're not giving equipment away. Where a site can participate in flexibility markets, we recover our investment from a share of the revenue those markets generate. You get the assessment, the controller, the installation and the platform at no cost. We get a site worth operating.

The controller stays ours. We supply, install and maintain it at no cost. It remains a Shockflo asset, so you carry no hardware risk and no maintenance liability.

And why now. Ten founding places in total. Two are already live and running; eight remain. Founding sites are the reference cases we build the business on — they get everything at no upfront cost, and they're first into market operation as each site is commissioned.

Shockflo is early. We need ten reference sites with real data, real integrations and results we can publish — more than we need ten invoices.

What's included

Genuine list prices, charged from site eleven onwards.

Technical site survey credited in full on proceeding£495
Shockflo Controller — supplied and installed£850
Installation and commissioning£950
Platform access, first 12 months£1,740
Total value£4,035
Founding Site Programme£0
What happens at month 13. Founding sites continue trading. The platform moves to the Flex tier at £145 per site per month. Trading does not stop.
Eligibility

Check before you apply — it takes two minutes.

  • Half-hourly metered supply
  • Minimum 100 kW of controllable or flexible capacity — battery storage, EV charging, HVAC, refrigeration, process load or generation. This is a floor, not a target: sites with substantially more are prioritised.
  • Willingness to allow controlled operation within agreed limits
  • Twelve months of consumption data available
  • Site falls within standard installation scope

Subject to eligibility assessment and acceptance by our flexibility partner.

Standard installation scope. Covers controller mounting, connection to existing metering and communications within the same plant room or switch room, and commissioning. Sites requiring additional cabling runs, civils, switchgear modification or DNO applications will be quoted separately following survey.
Under 100 kW?

You're not out. You're just on a different route.

The founding programme is aimed at sites that can participate in flexibility markets. Most sites still have a strong case for savings without market participation — solar self-consumption, peak reduction, tariff optimisation and load scheduling. Start with an assessment and we'll tell you what's there.

Start an assessment — free
Apply

Tell us about the site.